Kuwait AlOun Well 2

100%
Target 20,510 KD
Funded 20,513 KD
Remain 0 KD
Country :
Benin
Project Type:
Large artesian well
Project No.:
2020BIWA0031

Project Specifications

Beneficiaries:
2000-10000
Many African villages suffer from water scarcity or complete lack of water, which forces them to bring them from far away on the
back of animals, which costs a lot of time and effort especially women and children involved in fetching water
Project Description
The machine is drilled to the level of water under the rock layer to a depth between 50 to 200 meters and is equipped with an electric
pump and an upper tank with a stand for the tank OR a solar power system to generate electricity for the pump or generator


Notice
The image is an example of the project shape and not necessarily identical to it